43
43
Superion HPS solid carbide Drill
Coupler: Superion® 
Code:
0505
Share on Facebook    Share on Twitter    Share on LinkedIn    Email a friend
Die Herausforderung

Exceeding Expectations.

Our customer, who manufactures couplers for the heavy equipment industry, was facing supply chain issues from their current supplier and began looking for options that met their current process while also satisfying their supply needs.

Knowing that Allied took pride in having quick turnaround solutions, this customer asked Allied for help. We immediately got to work testing, tweaking, and developing the perfect drill that met the exact penetration rate our customer was previously running. Using the HPS Superion solid carbide drill—designed with AM420 coating for enhanced heat thresholds and tool life— the customer received the support they were looking for.

In addition to consistent speed and feeds and a decreased lead time from 12 weeks to 6 weeks, the Superion drill also dramatically increased the tool life from 2400 liner inches to 5000 linear inches—an almost 108% increase. Overall, the customer received the shorter lead time they needed with the added benefit of over double the tool life they were previously experiencing. Call us to help you find the right tool for the job.
 

Product: Superion HPS solid carbide drill
Objective: Quicker lead time
Industry: Heavy equipment
Part: Coupler
Material: Nodular iron (220 Bhn)
Hole Ø: 0.244" (6.2 mm)
Hole Depth: 5.512" (140.0 mm)
Tolerance: +0.008" (0.2 mm)
-0.004" (0.1 mm)
Surface Finish: 125 Ra

 
Die Lösung
Superion Solid Carbide Drill
  • HPS geometry, helical flutes:  200303-11
 
Measure Competitor Drill Superion Drill
RPM 4500 4500
Speed 287.8 SFM (87.72 m/min) 287.8 SFM (87.72 m/min)
Feed Rate 0.0036 IPR (0.09 mm/rev) 0.0036 IPR (0.09 mm/rev)
Penetration Rate 16 IPM (406.4 mm/min) 16 IPM (406.4 mm/min)
Cycle Time 20.7 sec 20.7 sec
Tool Life 2400" (60.96 m) 5000" (127 m)

 
Die Vorteile
The Superion solid carbide drill provided:
  • 108% increase in tool life
  • Quicker lead times
  • Maintained cycle time